MIL MIL-STD-2003A

Original price was: $40.00.Current price is: $20.00.

Electric Plant Installation Standard Methods for Surface Ships and Submarines
standard by Military Specifications and Standards, 09/03/2009

PDF FormatPDF FormatMulti-User-AccessMulti-User AccessPrintablePrintableOnline downloadOnline Download
Category:

This standard covers shipboard installation requirements for electrical cable, equipment, penetrations, cableways, and connectors. This standard consists of this general standard and five parts as follows: Part 1 (Cable) Preparation and end-sealing, entry to equipment and connectors, repair and splicing. Part 2 (Equipment) Equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power. Part 3 (Penetrations) Swage tubes, stuffing tubes, kickpipes, surface ships and submarines, hull penetration, and general. Part 4 (Cableways) General, submarine, surface ship and cable protection. Part 5 (Connectors) Cable and conductor preparation in accordance with MIL-C-81511, MIL-DTL-5015, MIL-DTL-26482, MIL-DTL-28840, MIL-DTL-22992, and MIL-DTL-38999 connectors.

Product Details

Published:
09/03/2009
Number of Pages:
7
File Size:
1 file , 170 KB
Note:
This product is unavailable in Ukraine, Russia, Belarus